A B C D E F G H I J K L M N O P Q R S T U V W X Y



Back to: "C"

cargo handling
Fonte1
INTERNATIONAL CIVIL AVIATION ORGANIZATION. Airport planning manual: part 1: master planning. 2nd ed. Montreal, 1987. (Doc. 9184 AN/902).
Fonte2
INTERNATIONAL CIVIL AVIATION ORGANIZATION. Heliport manual. 3rd. ed. Montreal, 1995. (Doc 9261 AN/903).
Contexto
Cargo handling areas are planned on the basis of a square metre per tonne handled per unit of time, but this ratio can vary with the traffic mix, degree of containerization etc, and further categorization may be necessary usually based on analyses of air way-bills.
Cargo handling gear is normally stowed across the hatches in a fore and aft direction when not in use and therefore precludes the siting of winching zones on the hatch tops.
Subárea
Operations
Spanish
manipulación de la carga