<< lifting loop | lifting operation | liftoff >>
Back to: "L"
lifting operation
- Fonte1
- INTERNATIONAL CIVIL AVIATION ORGANIZATION. Airport services manual: part 5: removal of disabled aircraft. 4th ed. Montreal, 2009. (Doc. 9137 AN/898).
- Contexto
- Jacking loads must be calculated prior to any lifting operation. The specific ARM will provide details on how to calculate the expected vertical loads during a levelling and lifting operation. The structure near the jack points must be undamaged and capable of carrying the anticipated loads.
- Subárea
- Operations
- Spanish
- operación de elevación