A B C D E F G H I J K L M N O P Q R S T U V W X Y


<< lifting loop | lifting operation | liftoff >>

Back to: "L"

lifting operation
Fonte1
INTERNATIONAL CIVIL AVIATION ORGANIZATION. Airport services manual: part 5: removal of disabled aircraft. 4th ed. Montreal, 2009. (Doc. 9137 AN/898).
Contexto
Jacking loads must be calculated prior to any lifting operation. The specific ARM will provide details on how to calculate the expected vertical loads during a levelling and lifting operation. The structure near the jack points must be undamaged and capable of carrying the anticipated loads.
Subárea
Operations
Spanish
operación de elevación